Investment completion: November 28, 2023.
A double-sided brine grading tower that operates in a closed circuit. Made from C24 grade spruce wood.
Core with an area of 5.0 mx 2.7 m filled with plum sloes.
Underground technology – two tanks with a capacity of 5.0 m3.
A warm-colored LED strip is installed in the upper part of the graduation tower.
Flat roof covered with thermally weldable felt.
תגובות