top of page

Brine graduation tower with ground technology, Sobienie - Jeziory commune

amfiteatr

Completion of the investment: 8th November 2023




  1. External graduation tower with ground technology. The graduation tower structure is made of spruce wood, class C24, with a height including the tank of 3.5 m.

  2. Ground technology - a square tank with a side of 4.0 m and a height of 0.6 m made of fiberglass, placed under the structure. The drainboard covering the tank is made of a composite board.

  3. Lighting from a waterproof LED strip on the upper entire length in a circle.

  4. Decorative finishes – stainless steel openwork.


 
 
 

Comments


realizacje: 733 773 688

koordynator: 732 747 243

biuro:  733 822 440

księgowość: 733 700 621

e-mail: amfiteatr@onet.eu

SELEN S.C.

Kazimierz Łapczuk, Marek Matusik

Produkcja tężni solankowych i grot solnych

ul. Rodła 38

75-391 Koszalin

woj. Zachodniopomorskie

NIP 671-16-56-229

Regon 331307386

Teznia_solankowa_Trzebnica_ul_Lesna_Trzebnica_8106168_edited_edited.png
selen logo ok_edited.png
bottom of page