top of page

Salt cave with an internal brine graduation tower in Sandra Spa Karpacz

amfiteatr

Investment completion: November 19, 2023.







  1. Salt cave with a total area of 15 m2.

  2. Salt bricks with a total area of approximately 12 m2 are placed on two walls, and salt lamps are placed irregularly.

  3. Gypsum ceiling imitating a cave vault, in the middle a black hole with optical fibers as a starry sky with an RGB light generator changing colors.

  4. Internal brine graduation tower in a wooden casing, with a plum sloe, on which the brine flows in a closed circuit; graduation tower dimensions 3.4 x 2.2 x 0.9 m.

  5. The equipment also includes relaxing music with speakers mounted in the ceiling.



 
 
 

Comments


realizacje: 733 773 688

koordynator: 732 747 243

biuro:  733 822 440

księgowość: 733 700 621

e-mail: amfiteatr@onet.eu

SELEN S.C.

Kazimierz Łapczuk, Marek Matusik

Produkcja tężni solankowych i grot solnych

ul. Rodła 38

75-391 Koszalin

woj. Zachodniopomorskie

NIP 671-16-56-229

Regon 331307386

Teznia_solankowa_Trzebnica_ul_Lesna_Trzebnica_8106168_edited_edited.png
selen logo ok_edited.png
bottom of page